Gongyi Xinqi Polymer Co., Ltd.Papermaking PolyacrylamideWET-END SELECTION DESK
PAPER MACHINE / PAM RETENTION · DRAINAGE · STRENGTH
SEND FURNISH DATA →
WET-END NOTE 01 / SELECTION

How to Select Papermaking Polyacrylamide

Choose papermaking PAM by retention, drainage or dry-strength duty, furnish charge, shear, paper quality and machine trial evidence.

FURNISH
actual stock
ADDITION
defined sequence
EVIDENCE
measured sheet
Paper wet-end laboratory retention and drainage test with pulp furnish
WET-END NOTE 01 / SELECTION

Published · Updated · Gongyi Xinqi Polymer Co., Ltd.

SHEET INDEX01Separate the product duties02Describe the furnish03Map the current chemistry04Select a bounded candidate set05Reproduce machine shear06Measure the full result07Plan a controlled trial08Preserve supply identity09Carry the machine evidence into purchasing10Machine-trial record
01

Separate the product duties

Retention and drainage CPAM, dual-system PAM and dry-strength PAM solve different paper-machine tasks.

State the primary task before comparing charge, molecular profile or product form.

02

Describe the furnish

List fibers, fines, filler, broke, starch, sizing, conductivity, pH, temperature and anionic demand.

Use normal and difficult furnish windows rather than one clean laboratory pulp.

03

Map the current chemistry

Record coagulant, fixative, retention polymer, microparticle, strength aid and addition sequence.

A new PAM must be evaluated inside the complete wet-end program.

04

Select a bounded candidate set

Screen plausible ionic and molecular profiles at equal active addition with blank and incumbent controls.

Avoid choosing the highest charge or viscosity from a specification sheet.

05

Reproduce machine shear

Apply stock consistency, mixing, contact time and fan-pump or screen-equivalent shear before measurement.

Retention measured before realistic shear may not predict the headbox response.

06

Measure the full result

Combine retention, ash, drainage, white-water solids, formation, strength and machine cleanliness as required.

Approve the complete paper-machine balance, not one attractive number.

07

Plan a controlled trial

Define chemical steps, sampling, stabilization time, test methods and stop conditions before the machine trial.

Change one program variable at a time whenever operations allow.

08

Preserve supply identity

Link sample code, active basis, preparation, COA, SDS, packaging, quotation and receiving checks.

Retest after material furnish, chemistry, machine or product changes.

09

Carry the machine evidence into purchasing

Use the demonstrated furnish, preparation and measurement window when reviewing Cationic PAM Retention Aid: Write a Furnish-Based Purchase Specification; PAM Retention Aid for Tissue: Protect Softness, Absorbency and Sheet Uniformity.

Retain the accepted sample identity, quality gates and unresolved conditions with the quotation. A product or process change should receive the relevant review before it becomes part of routine supply.

10

Machine-trial interpretation and release record

Choose the decision boundary before creating the candidate list. A retention problem, a drainage bottleneck and a conditioned sheet-strength failure may coexist, but they do not necessarily require the same polymer. State which outcome must improve first and which quality measures must remain unchanged. Preserve the actual furnish and wet-end program with that statement so laboratory work does not gradually drift toward an easier but irrelevant pulp.

Build an evidence matrix with candidate code, preparation, active addition, chemical sequence, shear, retention, drainage, formation and the required paper property. Separate missing measurements from failed criteria. A product can remain a candidate for further work without being considered ready for routine purchase. Include current and difficult stock conditions rather than treating every result as representative of the full machine schedule.

Translate the preferred candidate into a practical trial plan. Verify feeder, dilution, contact and approach-flow constraints before setting production comparisons. Define sampling intervals, system stabilization, reference returns and stop conditions with production and quality staff. Record unavoidable furnish or speed changes and exclude transition periods from steady-state ranking. Preserve the resulting operating envelope, not only one successful dose. Connect it to the sample, quotation and first production shipment, and define which stock or chemistry changes require another comparison.

WhatsAppEmail